Before pricing your CAD archive, find one complete CAE project
A folder of models can be substantial without containing the engineering workflow a buyer needs. The next useful count is complete projects, with their working files and results.
If your company has years of CAD and simulation work, a request for engineering data can sound like a reason to export everything. Current evidence points to a more selective first step: identify one real project whose requirements, design, setup, results and validation can be traced together.
In the engineering buyer record we reviewed on November 15, the October 28 update shifted priority from CAD screening to CAE. The requested package is 100 to 150 complete projects with original working files across nine specified stages. The initial sample is one complete real project. This is one active brief, not a rule for every engineering buyer, and not a completed order.
For an owner, the question is: do you have a complete deliverable already, or would you be paying to create one before its value is known?
Count projects, not just models and terabytes
| What you hold | What it demonstrates | What remains to establish |
|---|---|---|
| Renderings or neutral-format exports | A representation of geometry | Native modeling history, editable parameters and the associated engineering record |
| Native CAD plus drawings | More of the design and manufacturing context | Requirements, revisions, rights and any simulation relationship |
| Simulation results | Outputs from a run | The setup, assumptions, software version and links to the model and validation |
| A complete CAE project | A connected engineering workflow, if the files actually support it | Fit to the buyer's exact stage list, reproducibility and licensing authority |
This is a readiness guide, not a ranking of prices. A neutral export can be useful alongside native files; the point is that it does not prove a full native workflow exists.
The current brief's numbers describe different steps: one complete sample for review, then a proposed 100 to 150-project package. One reviewed sample is not evidence that every project in an archive qualifies. The recorded November 3 update prioritized existing archives for the initial pilot; commissioned projects remain a question of volume, timing and simulation scope.
The research trend also favors inspectable engineering artifacts
Parametric CAD Bench v3, submitted November 2, evaluates 100 tasks: 30 creation tasks, 30 create-and-edit tasks and 40 drawing-to-CAD tasks. It checks native artifacts for geometry and specification consistency. The authors explicitly separate executable code from satisfying an engineering request. Primary paper.
Visible calculation: 30 + 30 + 40 = 100 benchmark tasks. These are research tasks, not Rightmark projects or buyer demand volume.
This supports a practical inference: preserve the evidence of how a design works, not just an attractive final shape. It does not establish the price of commercial CAE records, and this CAD benchmark is not the same specification as the private CAE inquiry.
The money: three different units, only one public dollar comparator
There is no defensible public per-CAD-file or per-CAE-project rate in the sources checked for this note. Rightmark's engineering page starts with scope and rights review. A company-archive benchmark can still help an owner understand the alternative route, provided it stays attached to the whole company archive.
| Potential package | Current public dollar context | Correct interpretation |
|---|---|---|
| Standalone CAD collection | No published rate established | A count of parts does not generate a supported dollar total |
| Complete CAE project package | Quote required after scope and sample review | Do not divide a guessed package budget by 100 or 150 projects |
| Shut-down startup's code and workspace archive | $10,000 to $100,000 per company; Medium confidence | An adjacent whole-company benchmark, not a CAD or CAE price |
Source: Rightmark Price Index and CAD/CAE review scope, checked November 15. The archive reference has a different deliverable. It is not additive to an unknown engineering-project quote, and private negotiation figures are not disclosed.
The distinction matters for engineering companies that also hold code, email, test logs and other operational records. Describe those as a separate possible package. Do not claim that possessing CAD files alone qualifies the business for the $10,000 to $100,000 archive range.
You can put a dollar limit on preparation even before a sales price exists. Consider a hypothetical sample requiring 25 staff hours at an internal cost of $80 an hour: 25 × $80 = $2,000. These are planning assumptions, not a supplier quote. Before incurring that expense, establish the sample scope, review permissions and whether the buyer actually wants the project type. Preparing the entire archive first would multiply an unpriced risk.
If a future written gross license quote is Q and confirmed preparation costs are C, the amount before other fees and taxes is Q minus C. Today Q is unknown for the projects in this note. A public benchmark for a different package cannot fill it in. The realistic commercial payoff from the first review is a go/no-go decision and a basis for a quote, not a promised return.
Use one project to reveal the missing links
Our preparation flow groups the work into five checkpoints. It is a reader's guide, not a reproduction of the buyer's nine-stage specification.
| Checkpoint | What to inventory | What to flag before any sample |
|---|---|---|
| Requirements | The design problem and acceptance conditions | Missing or client-restricted specifications |
| Native design | CAD files, software/version, drawings and revisions | Neutral exports without the native source; third-party components |
| Simulation setup | Loads, boundaries, materials, solver settings and model links | Results whose original setup cannot be recovered |
| Results and validation | Output files, comparison records and test evidence actually held | Absent stages or reports disconnected from the working files |
| Authority and delivery | Ownership, permitted uses and the agreed sample process | Client restrictions, personal or confidential material, and scope needing specialist review |
Start with a description of the files and gaps. Rightmark's current public process explicitly begins with words, not uploaded engineering files. If a sample is requested, follow the agreed rights and review process. A consultancy's own R&D and a client's confidential project should not be treated as interchangeable inventory.
A project that fails this first mapping may still be useful for a different request. State the gap and seek that fit; do not reconstruct missing results and present them as historical engineering work.
Sources and limits
We reread the authenticated engineering buyer updates through November 5, a related engineering-company intake, public catalog and engineering guidance on November 15. The intake is not evidence that a qualifying CAE package exists. We inspected no native CAD or CAE files. Buyer identity, private budgets, fees and correspondence remain withheld. The recorded request has no verified sample acceptance or completed payment in this analysis. Current research explains relevance, not a price forecast.
Company-owned engineering projects with their original working records
Describe native CAD and CAE projects, associated drawings, setups, results and history. The current private inquiry prioritizes complete CAE projects; the public Wanted page has no open purchase request.
Read the CAD/CAE review process. Start with a description and rights summary. Do not send the engineering files in the first step.
CAD/CAE pricing
Scoped quote required
No verified public USD rate per CAD file or complete CAE project was established in the sources checked for this note.
A separate whole-company archive benchmark is $10,000 to $100,000 per shut-down startup's code and workspace archive, with Medium confidence. It applies only to that different package. It does not establish engineering-project proceeds and cannot be divided into a per-part or per-project rate.
Price Index, Q4 2026, checked November 15. No public CAD/CAE unit rate was established in the checked sources. Keep preparation spending conditional on an agreed review scope.
Map one complete project before preparing the rest
State the project type, native formats, software versions, stages held, known gaps and who can authorize the review.
For an engineering business with a wider operational archive, explore the company-data route separately. Do not assume the two packages have the same economics.